Fundamental Foundation
Work on the foundation of the new store continues. They've brought in gravel to create a street-level platform for the excavator, which continues to groom the bottom level and work on the side walls. At drilling rig was brought in to bore holes in the middle of the right side. And shortly after that, what looks to be structural steel and two wooden crates arrived. While there's been periods of sun and warm temperatures, at other times in the time lapse (4:35 p.m.) you can see snow flurries. [I just caught up creating the time lapse movies, which are named aprxx.mov, where xx is the day of the month, 1-30.]
1 Comments:
Excellent work, thanks for doing this, I enjoy keeping the image on auto-refresh on my secondary monitor while I work.
Post a Comment
<< Home